Overhead Interconnection Network for CHP Plant – THERMOKIPIA SAVVIDIS S.A.

Project:
Overhead Interconnection Network for CHP Plant – THERMOKIPIA SAVVIDIS S.A.

Location:
Nevrokopi, Drama

Project Description:
Construction of a 20kV overhead medium-voltage network, including underground connections, for the interconnection of a 5.0 MW cogeneration (CHP) plant owned by THERMOKIPIA SAVVIDIS S.A. in Nevrokopi, Drama.

Completion Year:
2014